World of
PORR

Stories. Insights. Highlights.

Welcome to the World of PORR

Immerse yourself in the diversity, expertise and innovative strength of PORR. Here you will find exciting stories, in-depth insights and many highlights relating to PORR and its projects. Whether civil engineering, infrastructure, environmental technology or engineering and design – we show you what happens behind our construction fences. Find out how we build, what technologies we use and how we design sustainable solutions. And join us in looking beyond the horizon – to exciting construction projects from all over the world. The World of PORR is more than a blog: it is a journey through our construction sites, ideas and visions. Be inspired. Discover technical background information. And experience how planning becomes reality.

Dance on the construction site

In our new video, Rafael Lesage dances across the PORR construction site of the Aspern Central Vocational School in Vienna. For him, it is literally the biggest stage. For PORR, it is Austria's largest PPP building construction project. A combination of concrete and balance, technology and dance.

Rafael rehearsed a special choreography for us. Equipped with a helmet, PORR jacket or vest and safety shoes, he enters the construction site. Because occupational safety rules apply to everyone, including dancers. He now stands alone on the roof. And then it begins. Camera rolling. Sound running. Rafael dances. A drone approaches, circles him, rises again and shows cranes, excavation pits, excavators and the enormous dimensions of the project before flying through Rafael's legs. A project of superlatives. 

A construction site as a stage. A dance between history, the present and vision.

PORR in figures

  • 0

    Home markets

  • 0

    PORRians

  • 0

    bn order backlog (2025)

  • 0

    Concrete measures for more sustainability

WORLD OF PORR The Construction Magazine.